What is the plan check turn-around time for a Building Permit Application?

Permit applications are divided into three categories that determine the timeline for either the permit approval or for the initial plan review comments.

  • Some home projects limited in size are subject to Building Permit Exemption when being done as a single activity or not in conjunction with a larger project. These include:
    • Painting, wallpapering, bookshelves, cabinets, tile or marble work
    • Fences and gates not higher than 6 feet
    • Roof, deck, and siding repairs when 100 square feet or less
    • Retaining walls less than four feet high when it can be demonstrated that there is no lateral pressure against it
  • Small-sized home projects often only require an Expedited Building Staff Review before a building permit can be issued. This process is usually completed in 1-2 Days.

Small home projects are typically characterized as:

    • Change of contractor.
    • Minor interior electrical repairs, upgrades, or temporary electrical service not requiring plans.
    • Minor interior plumbing repairs, upgrades, or water heater replacement, not requiring plans.
    • Minor interior mechanical repairs, upgrades, or HVAC replacement, not requiring plans.

Roofing and window change-outs. Please contact the Planning Department before submitting a Building Permit applications. These items must be formally exempted from Design Review.

  • Medium-sized home projects often require Standard Building Staff Review before a building permit can be issued. This process is usually completed within +/- 10 days.Medium home projects are typically characterized as:
    • Minor interior remodels involving plans.
    • Deck repairs involving plans.
    • Minor retaining wall construction, involving plans.
    • Dock repairs or replacements, at the Lagoon, involving plans.
    • Minor project revisions which do not include exterior changes.
    • Residential solar P.V. systems (not equipped with an ESS system).
  • Large-sized projects often require multi-department review — (e.g., Engineering, Fire, Public Works) before a building permit can be issued. An initial Plan Review Letter is usually issued +/- 30 Days.
    • Additions, major repairs involving extensive structural components
    • Major repairs involving extensive structural components Permit Applications for larger more complex projects — an initial plan review letter will be issued in twenty-eight (28) working days.
    • New homes
    • Major remodels involving extensive structural upgrades
    • Large-sized home projects often require Multi-Department Review (e.g., Engineering, Fire, Public Works) before a building permit can be issued. An initial Plan Review Letter is usually issued +/- 30 Days. The Plan Review Letter will outline any additional requirements and next steps.Large home projects are typically characterized as:
      • Additions, major repairs involving extensive structural components.
      • Major repairs involving extensive structural components

      More complex projects will require +/- 35 Days for initial Plan Review Letter to be issued.

      • New homes.
      • Major remodels involving extensive structural upgrades.

To confirm the type of building permit review required for your project, contact the Planning & Building Department at (415) 435-3838.